The “engine” is a vintage Mercedes-Benz Unimog which used to belong to the Swiss Army and has now been fitted with road-rail equipment, so the vehicle can be operated
The protective screen has really proved to be “the philosopher’s stone” for this project as on the one hand it allows work to be carried out without interruption and it also protects the continuous flow of traffic from being begrimed by the diluted fireproof mortar. This means that the traffic can at least pass the roadworks on one lane as up in the narrow Hinterrhein valley there is only the narrow canton road H13 available for a one lane diversion for on-coming traffic.